Assess
We check slope, soil, caliche, drainage, and wall height.
Service 08 of 14
Built for El Paso's caliche soil, eight inches of rain, and the spring wind season. Free estimates across El Paso County and southern New Mexico.

Retaining walls in El Paso hold back more than dirt—they manage grade, monsoon runoff, and the caliche underfoot on sloped lots across the West Side and foothills. We build block and stone retaining walls across El Paso, Horizon City, Socorro, and Canutillo with proper base, drainage, and engineering where the height calls for it, so the wall stands through wind, rain, and the slow pressure of desert soil.
Local knowledge
Sloped lots near the Franklin Mountains and West El Paso need walls to create usable space. Without them, rain carves gullies and patios slide. A wall turns a slope into a yard.
Monsoon runoff from July through September puts real hydrostatic pressure on any wall. Drainage stone and weep paths behind the wall let water escape instead of pushing it over. We build that in every time.
Caliche is dense and hard to dig but it is not infinite strength. Walls need a proper base into stable material, not just set on top of loose fill. We excavate to a competent base and compact.
How it works
We check slope, soil, caliche, drainage, and wall height.
Taller walls get engineered plans for safety and permitting.
Trench to a stable base and set the first course level.
Block or stone stacked, pinned, and drained per plan.
Caps set, drainage confirmed, and backfill compacted.
Transparent pricing
| Tier | Price range | What's included |
|---|---|---|
| Low wall (under 3 ft) | $2,500–$7,500 | Block wall with base and drainage. |
| Mid wall (3–5 ft) | $7,500–$18,000 | Engineered block or stone with drainage system. |
| Tall / terraced | $18,000+ | Engineered walls, terraces, and full drainage. |
Walls over 4 feet typically require engineering. Free estimates include drainage plan.
Recent work

Terraced retaining walls on a slope
Timeline: 3 weeks

Low garden wall with drainage
Timeline: 1 week

Engineered wall for driveway support
Timeline: 2 weeks
Where we build
Questions
Yes. Walls over about 4 feet are engineered for safety and permitting.
Yes. Drainage stone and weep paths relieve water pressure behind the wall.
Both. Block is cost-effective; natural stone is higher-end. We help you choose.
Yes. We excavate to a competent base, including caliche when needed.
Most walls take 1–3 weeks depending on height and length.
Yes. We warranty installation against structural failure for a set period.
Related services
Start with the site
We respond within one business day.
Many of our partner landscapers offer financing options, so you can start your project now and pay over time. Ask about financing when your landscaper calls. Subject to credit approval.